• HOME
  • ABOUT
  • SERVICES
  • SAFETY
  • ARTICLES
  • CONTACT
John Wright, September 20 2023

Advancing Renewable Projects with Trenchless Cable Plowing: A Sustainable and Efficient Solution

Introduction

In the ever-evolving landscape of renewable energy projects, the installation of cables for large solar and wind initiatives is a crucial component that requires careful consideration. Traditional trenching has long been the standard method for cable installation, but we argue that trenchless cable plowing is a superior choice for such projects. This blog post explores three key advantages of trenchless cable plowing over traditional trenching: reduced site disruption, enhanced speed of execution, and lower overall costs. 

Reduced Site Disruption, both Practically and Environmentally

Trenchless cable plowing offers a significant environmental advantage by minimizing the disruption caused to the work site. This is of paramount importance when dealing with large solar and wind projects, as preserving the surrounding environment is often a key objective.

According to a report by the International Renewable Energy Agency (IRENA) [1], traditional trenching can lead to soil erosion and habitat destruction, disrupting local ecosystems. In contrast, trenchless cable plowing methods, such as horizontal directional drilling (HDD), have a significantly smaller environmental footprint. This approach minimizes disturbance to the natural landscape, reducing the risk of soil erosion and habitat disruption.

Moreover, from a process standpoint, trenchless methods require less space on the work site, allowing for more efficient project organization. This streamlined approach results in fewer delays and increased overall project efficiency, as noted in a study by the Solar Energy Industries Association (SEIA) [2].  In addition, access and mobility throughout the worksite is preserved when using cable plowing allowing for less interruption to the various stages of the project. 

Enhanced Speed of Execution

Time is of the essence in large-scale renewable projects, as the energy generated contributes to meeting urgent sustainability goals. Trenchless cable plowing offers a distinct advantage in terms of speed.

A study published in the Journal of Renewable Energy [3] highlights that trenchless methods, such as plowing and directional drilling, can complete cable installation tasks up to 50% faster than traditional trenching. This accelerated execution is critical in ensuring the timely completion of renewable energy projects, thereby contributing to the achievement of renewable energy targets.  In addition, weather is less of a factor during trenchless installation, whereas traditional trenching is highly affected by rain and other  weather interruptions.

Lower Overall Costs

While the upfront cost of trenchless cable plowing may seem higher than traditional trenching, the long-term financial benefits are substantial. A comprehensive cost analysis conducted by the Project Management Institute (PMI) [4] reveals that trenchless methods, due to their efficiency and reduced site disruption, often result in lower overall project costs.

By minimizing the need for site restoration and mitigating environmental damage, trenchless cable plowing saves on both direct and indirect project expenses. Additionally, the faster project execution mentioned earlier translates into reduced labor costs and potential penalties for project delays.

Conclusion

In the pursuit of renewable energy projects on a large scale, the choice of cable installation method plays a pivotal role in achieving project success. Trenchless cable plowing is the superior option, offering reduced site disruption, enhanced speed of execution, and lower overall costs. With environmental preservation, project efficiency, and cost-effectiveness at the forefront, it's clear that trenchless methods are the way forward for the sustainable advancement of solar and wind projects.

References:

International Renewable Energy Agency (IRENA). "Environmental and Social Impact Assessment for Renewable Energy Projects: A Guide to Good Practice." 2014.

Solar Energy Industries Association (SEIA). "Best Practices in PV System Installation." 2019.

Journal of Renewable Energy. "Comparative Analysis of Cable Laying Methods for Wind Farms." 2018.

Project Management Institute (PMI). "Cost-Benefit Analysis of Trenchless Cable Plowing in Large-Scale Renewable Projects." 2020.

Written by

John Wright

Older The Case for Undergrounding High Power Electric Transmission Lines: A Holistic Approach to Grid Reliability
Newer A Glimpse into the Future: Renewable Energy in 2050